Garage, Shed, and Workshop Wiring in Wesley Chapel, FL
Freezers, Benches, Chargers, and Sheds|Licensed & Insured, EC13011268
The cars are only part of what a Wesley Chapel garage holds, and whatever else shares the bay needs power where it will actually sit. Kennedy Electric adds the receptacles, lights, and circuits for it, and brings power out to the shed in the back yard.
Mention what the garage holds today and what's coming next.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

At a glance
Why Wesley Chapel Garages Fill Up, and What Pasco Asks
A Wesley Chapel garage can be a crowded room. About one in four owner households here, roughly 4,900 homes by census estimate, has three or more vehicles. When the floor space a third car would take holds something else that plugs in, the garage can need more receptacles and circuits than it was built with.
Pasco's permit rules reach into the garage as well. Swapping a garage door opener onto its existing electrical is on the county's no-permit list, while a new receptacle for one is not. A detached garage, or any shed outside the county's small-shed exemption, goes through the residential additions package, with a site plan showing every structure on the lot. Either way, running new wiring out to that building still needs a permit.
How it runs
Where Each Garage Run Goes, and Who Inspects It
-
1
Mapping the garage bay
Start with where each thing will stand once the cars pull in. The freezer may go by the door to the house, the bench along the back wall, and the charger on the side nearest the car's port. Those positions, not a standard layout, decide where each box is cut in.
-
2
Choosing the route for each run
Inside a drywalled garage, the cable can be fished through the wall from the attic. On a block wall, it runs in surface conduit strapped to the face. Out to a shed, the run goes underground in a trench across the yard, to a depth the code sets for the method used, and comes up in conduit at the shed wall.
-
3
Pasco's inspection of the new circuits
Each of those runs adds new wiring, so it goes on a Pasco electrical permit. On a detached garage a builder is putting up, our work can go under the builder's permit. Otherwise the permit application comes from us, along with the request for the county's inspection. The county's inspector then checks the new circuits.
What we cover
What Shares the Garage, Wired Circuit by Circuit
What else the garage holds decides which circuits it needs, item by item.
A second refrigerator or chest freezer
A freezer full of food should keep running whatever else in the garage trips a breaker. That's why it can sit on a receptacle that bench tools don't share, mounted where the appliance will stand, so its cord doesn't snake behind a shelf.
The bench and the tools on it
A bench needs power right at the work surface, so its receptacles can sit just above the top, where a sander and a shop vacuum plug in side by side. A circuit of its own lets both run at once. Garage receptacles carry the ground-fault protection the code requires there.
A car charger's spot in the bay
A charger needs a dedicated circuit, and its spot is best chosen with everything else in the bay, near the side of the car where the charging port is. The charger's size is a question of its own.
A hobby corner or home gym
A gym or craft corner takes over whichever end of the garage the cars leave free. Receptacles there can sit low for a machine on the floor and higher for a sewing table, and a switch at that end can light the corner without the rest of the bay.
The shed beyond the garage
When bikes, yard tools, and a pressure washer move out to a shed to free a bay, we size the shed's wiring to what moved with them. A shed is a building of its own, so it takes one supply from the house. One that already has a line out to it keeps that line, enlarged if the load grows, and a shed that turns into a workshop takes its supply as a feeder to a small panel inside.
Every item on that list adds load, so whether each one can have a circuit depends on the house panel's capacity as well as its open spaces.
Pricing
Quoting Garage Circuits and Shed Feeders
Your price follows how many new circuits the garage takes, how long the run to a shed is, and how much spare capacity your panel has.
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Our warranty
05If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
We park three cars in our Wesley Chapel garage. Where can new outlets go so we can still reach them?
We're adding a welder to our Wesley Chapel garage. Will it share the bench circuit?
Our garage came with the house. Is a newer Wesley Chapel garage already wired for a shop?
The cable out to our shed will run in buried conduit. Can ordinary house cable go inside it?
We'd like to cool our Wesley Chapel shed with a window unit. Can its wiring carry one?
Reviews
Garage and Shed Owners Speak Up
Straight from Google, in our customers' own words.
Request service
Tell Us What Your Garage Holds
Name what sits in the garage or shed and anything you mean to add, and include a picture of your main panel if you can. Our office will reach you during business hours.



