Commercial Build-Outs and Renovations in Brooksville, FL
Tenant Spaces, Remodels, and Older Buildings|Scheduled Around Your Business|Licensed & Insured, EC13011268
Send the floor plan or a sketch, the equipment list, and your timeline.
- Three-phase and temporary power. For heavy equipment and for the build itself.
- Licensed & Insured. Florida Certified Electrical Contractor EC13011268.
On build-outs and renovations, we're typically hired by the general contractor, whether the space is an empty shell under a new lease or a business you already run. Before a wall closes, someone has to decide where the lights, outlets, and equipment go, and whether the building's service has room for them.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.
Planning the Space
What Goes Into the Electrical Plan for a Commercial Space
Where things go
Working under the general contractor, we coordinate the electrical layout with them and with you: where fixtures hang, where counters and desks need power, and which equipment needs its own circuit. Settling that before rough-in keeps change orders down once the walls are closed.
In a restaurant space, the plan also covers the shut-off wiring that ties the cook line to the kitchen hood's suppression system.
What the service can carry
A panel load calculation shows whether the existing service and panel can carry the new tenant's lighting, equipment, and HVAC, or whether the space needs a new panel, a subpanel, or more capacity from the power company. Kitchens and shops with large motors may need three-phase power.
Working around an open business
We work with your schedule. At a doctor's office, that has meant working on the specific days no patients were scheduled.
Power while the build is underway
A shell with no working service still needs lights and outlets for the trades. Temporary power covers the job until the permanent service is ready.
Build-out sequence
Electrical Work Inside a Build-Out
-
1
1. The walk-through
Our estimator walks the space with your project lead.
-
2
2. The estimate
Written based on the walk-through and the plans you shared with us.
-
3
3. Rough-in
Boxes, conduit, and wiring go in while the walls and ceilings are open, ready for the building department's rough-in inspection.
-
4
4. Trim-out
Fixtures, devices, and panel connections are finished, and the panel directory is labeled for the new layout.
-
5
5. Power on
Circuits are tested and energized, and the space is ready for its final inspection and the tenant.

| Scope | What it covers |
|---|---|
| Lighting layout and fixtures | LED fixtures and retrofits |
| Outlets and dedicated equipment circuits | Placed to the plan |
| Panels, subpanels, and service capacity | Sized by load calculation |
| Three-phase equipment power | Large motors and heavy equipment |
| Temporary power during construction | Lights and outlets for the trades |
| Exit signs and emergency lighting | Placed to the new path out |
| Sign circuits | A circuit ready for the sign |
We don't install standby generators or automatic transfer switches.
How Build-Outs are estimated
Estimating a Commercial Space
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
What drives a build-out estimate
03- The size of the space and the fixture and equipment list.
- Whether the existing service and panel can carry the new load.
- The building department's requirements for the project.
- Phasing, if the work has to happen around an open business.
Warranty
04If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
Real customer stories
Weeks Hardware
A project we're proud of: Weeks Hardware, in its historic downtown Brooksville building.
Straight from Google, in our customers' own words.
Will you wire the fire alarm and security system too?
Can we supply our own light fixtures?
Our space is in an older building. Does that change anything?