New meter base mounted on a pedestal beside a mobile home.
HomeService AreasWesley ChapelService Riser and Meter Base Replacement

Service Riser and Meter Base Replacement in Wesley Chapel, FL

Permitted Meter Base and Riser Replacement|Licensed & Insured, EC13011268

Everything a Wesley Chapel home draws from the grid passes through its meter base first. When that base, or the pipe carrying the line to it, wears out or takes storm damage, Kennedy Electric replaces it and arranges the outage with your power company.

Seen a leaning post or scorch marks on the meter base? Let us know.

Licensed & Insured · Florida Certified Electrical Contractor EC13011268★ Google RatedFree estimates on installs and replacements

Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

Wesley Chapel's Aging Meter Posts and Wind-Loaded Masts

At a glance

Wesley Chapel's Aging Meter Posts and Wind-Loaded Masts

Wesley Chapel has about 1,100 owner-occupied mobile homes, by census estimates, and roughly 840 of them were built between 1980 and 1999. A home from those years is now more than 25 years old, and the post or pedestal that holds its meter can be the same age. We replace that post or pedestal, its meter base, and the feeder into the home, and we install the new service when a replacement home is set on the lot.

Detached houses account for about 18,900 of the town's roughly 27,200 homes, also by estimate, so the wall-mounted base is the more common Wesley Chapel case.

Wind bends this equipment. During Hurricane Milton, Pasco saw peak gusts of 65 to 75 mph, and trees and power lines came down across the Wesley Chapel area. A mast carries the pull of the overhead line and any limb on it, and a post in an open yard has no shelter. After a storm, don't switch on anything that water reached until it has been checked. Keep clear of a line on the ground and report it to the power company. If smoke, sparks, or fire appear, clear everyone out and call 911.

The Day the Meter Comes Out

How it runs

The Day the Meter Comes Out

  1. 1

    Photos that show the mounting

    A photo of the post or wall, showing the meter and the line above or below it, tells the estimator whether the job is a pedestal, a mast, or an underground riser. Mention a recent storm or mower strike.

  2. 2

    Shutting off the service feeding the base

    A meter base can't be changed while it's live, so the service feeding it is shut off first, on a date we arrange with the power company. The power company's rules decide whether our electrician or its own crew removes the meter, and until then the meter and its seal stay untouched.

  3. 3

    The county's release before power returns

    A service change falls under a Pasco residential electrical permit. On permitted work, the power company won't restore power until the county releases it, and the county's electrical inspector sends that release once the final inspection passes. The meter goes back in after that.

What we cover

Riser Work Depends on Where the Meter Is Mounted

Meter posts and pedestals beside a mobile home

A mobile home's post or pedestal holds the meter base and the home's service disconnect. Trouble tends to show from the yard: a wooden post that has softened at the ground line and begun to lean, a base worked loose from its mounting, or an enclosure with scorch marks or rust. A replacement sets a new post or pedestal, mounts a meter base rated for the home's service, and reconnects the run to the home's panel.

Underground service: the conduit at the foot of the wall

When the power company's line arrives below grade, a run of conduit climbs out of the soil and into the bottom of the meter base. Damage tends to begin on that short piece of pipe at ground level: a mower or trimmer nicks it, a planting bed buries the joint, or a crack lets water follow the wires up. A new length of pipe goes in from the soil to the base, and a base whose inside shows rust or heat is changed with it. Each power company's rules decide who replaces the wires inside.

Overhead service: the mast, its straps, and the weatherhead

On an overhead service, a mast rises from the meter base past the eave or through the roof, and the power company's line attaches near its top, just below the weatherhead. Straps hold the mast to the wall, and where it passes through the roof, a flashing boot seals the opening. A loose strap lets the mast flex each time the line pulls on it, and a cracked boot can leak into the attic. A mast replacement covers new pipe from the base up, the weatherhead, and the straps, and a mast that passes through the roof needs that opening sealed again around the new pipe.

Pricing

Hourly Rates and Free Estimates for Meter Base Work

01

Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.

02

Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.

03

We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.

We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.

Our warranty

04

If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.

Common questions

When a Meter Post or Mast Needs Attention

We're replacing our Wesley Chapel mobile home with a newer one. Does the meter post have to change too?

It depends. If the post, its meter base, and the disconnect are sound and rated for the new home's service, they can stay. If the new home calls for a larger service, or the old post is failing, we install a new service at the post. On Pasco's checklist for permanent power, a mobile home's setup inspections all have to show as passed, so power to the new home waits on the setup as well as the electrical work.

The mast on our Wesley Chapel house tilted in a storm, but the lights still work. Can it wait?

Not for long. Working lights prove only that the wires inside the mast are connected, and nothing about the straps or roof fitting holding it. A tilted mast takes the line's pull at an angle its straps weren't set for, and the next storm adds to that. A bent mast is replaced rather than bent back into line. If the line from the pole sags low or reaches the ground, keep everyone clear and phone the power company first.

A sprinkler head sprays our meter base each time the system runs. Does that matter?

It can. A meter base is built for rain, but spray aimed at it on a schedule wears at its seals for years, and rust follows. Turning the head so its spray clears the wall is the owner's fix. If the base already shows rust through the metal, or water has been inside it, the base is replaced, and nobody should open it to dry it out.

Can the new meter base for our mobile home be mounted on the home's own wall?

Only if the home meets the electrical code's conditions for carrying its own service equipment. Otherwise the code keeps that equipment off the home and next to it, in sight of and within 30 feet of its outside wall, so a failed post is replaced with a post or pedestal.

Wires loop down out of the weatherhead on our Wesley Chapel mast. Is that slack supposed to be there?

Yes. The electrical code calls for a drip loop on each conductor, with the joint to the power company's line made below the weatherhead's opening. Rain then runs down the loop and drips off before it can follow the wires into the mast. How much conductor is left out for the loop can be set by the power company's service rules. If a loop has been pulled straight, so the joint now sits level with or above the opening, add a photo of it to the request.

Reviews

Owners Talk Through Their Meter Base Jobs

Straight from Google, in our customers' own words.

Google reviews widget
Ask About the Meter at Your Wesley Chapel Home

Request service

Ask About the Meter at Your Wesley Chapel Home

Tell us what you've noticed at the meter, and include a photo if one's handy. Our office will reach you during business hours.

Kennedy Electric
1160 Ponce De Leon Blvd, Brooksville, FL 34601
Monday through Friday, 8 a.m. to 4 p.m.
Licensed & Insured · Florida Certified Electrical Contractor EC13011268
Serving Citrus, Hernando, and Pasco Counties, and nearby Sumter County.
Property type*
Best way to reach you*

Related services

Service Riser & Meter Base elsewhere

Where we work