Three-Phase Power Services in Wesley Chapel, FL
Three-Phase Circuits for Commercial Tenants|Licensed & Insured, EC13011268
In a Wesley Chapel shopping center or office building, the tenant who owns the equipment is usually the one asking whether three phases reach the suite. Kennedy Electric brings three-phase circuits, disconnects, and panels to commercial suites and connects the equipment to them.
List each three-phase item and the suite it's going into.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

At a glance
Wesley Chapel's Tenant Mix and the Power It Draws
Retailers, local boutiques, and family entertainment anchor The Grove at Wesley Chapel, a center of 471,279 square feet whose cinema alone takes up 85,000 square feet, and its owner lists another 114 acres for development. A building on that land would start its electrical service on paper, which leaves room for a future tenant with three-phase equipment to raise the question while the plans are still being drawn.
Health care adds tenants of its own. Wesley Chapel has a hospital, and practices that set up in office suites near it can bring equipment built for three-phase power.
How it runs
Paperwork Behind a New Three-Phase Circuit
-
1
The equipment schedule and the load calculation
Pasco asks for load calculations and an electrical riser diagram on commercial electrical work, and both are drawn from the equipment the tenant plans to run. Each three-phase item's nameplate supplies its voltage and full-load current, and those figures sit beside the suite's lights, receptacles, and cooling in the calculation. A piece added to the list later goes back into it.
-
2
A permit for the three-phase run, then the inspection
Every new three-phase run in a suite, and every extension of an old one, is permitted electrical work in Pasco. Each inspection the permit calls for falls due as the run, its breaker, and the disconnect go in, and the inspection dates are the county's call. Above a set project value, Pasco also wants a notarized Notice of Commencement recorded with the Clerk of Courts.
-
3
When the suite's load outgrows its service
If the calculation shows the suite needs more than its service can carry, the job becomes a service change. The power company has its own part in that work, and Kennedy Electric coordinates with it on the timing.
What we cover
Which Wesley Chapel Tenants Ask for Three Phases
Each kind of tenant arrives with a different list.
A kitchen choosing between single-phase and three-phase models
Many commercial ovens, dish machines, and refrigeration units are sold in a single-phase and a three-phase version, and the order has to name one. Where only single-phase power reaches the suite, the order should name the single-phase version, since a three-phase model can't run on it. Where the kitchen does run three-phase, its panel also needs a free three-pole space for each new three-phase piece.
Dental practices with equipment rooms
A dental office's compressor and vacuum pump often sit in a utility room of their own, and the larger systems can call for three-phase power.
Fitness studios where cooling is the heavy load
Most treadmills and bikes in a studio plug into ordinary single-phase circuits, though a commercial treadmill's label is worth reading before the floor plan is drawn. In a room full of people working out, the air conditioning is often the bigger draw, and a larger rooftop unit can arrive with a three-phase nameplate. Its circuit is sized from that nameplate, with the breaker at or under the nameplate's maximum breaker size.
Anchors, cinemas, and the shops between them
A big-box store or a cinema in a power center often has a three-phase service of its own at the building, sized for its cooling and equipment. An in-line suite between two anchors may be fed differently, sometimes from a single-phase panel set up for a small shop. A tenant moving from one kind of space to the other shouldn't assume the new suite matches the old one.
Pricing
The Price of Three-Phase Work in a Leased Suite
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Our warranty
04If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
Does a three-phase job in a Wesley Chapel suite need sealed drawings?
How can we tell whether our Wesley Chapel suite already has three-phase power?
One of our three-phase units hums but won't start. What does that point to?
A spec sheet for equipment going into our Wesley Chapel suite says 240 volts. Does that make it three-phase?
We're replacing a single-phase oven with a three-phase one. Can the old circuit stay?
Reviews
Tenants and Owners Have Their Say
Straight from Google, in our customers' own words.
Request service
Confirm the Suite's Phases Before the Equipment Ships
Tell us what each three-phase piece is, with nameplate photos if you have them, and which suite it's going into. Our office will reach you during business hours.



