HomeTenant Build-Outs & RenovationsThree-Phase Power
Three-Phase Power for Commercial Equipment in Brooksville, FL
Equipment Circuits, Disconnects, and Three-Phase Panels|Shops, Offices, and Commercial Buildings|Licensed & Insured, EC13011268
Choose “I need a quote” on the request form.
- Panels sized by load calculation. Three-phase panels and subpanels with room for what's coming.
The new air compressor is on the shop floor, and its nameplate reads three-phase. It can't run until a circuit sized to that nameplate reaches it.
We run the circuit and disconnect, and connect three-phase equipment in commercial spaces.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.
Why Equipment needs Three-Phase
Why Heavy Equipment Runs on Three Phases
Three currents, one steady supply
Single-phase power, the kind in a house, rises and falls through zero 120 times a second. Three-phase power carries three currents, each offset from the others, so at any moment one of them is near its peak. A three-phase motor gets a steady push, starts more easily, and can be smaller for the same work. That's why compressors, large HVAC units, and shop machinery are built for it.
Matching the equipment to the building
Commercial three-phase systems come in multiple voltages. In a 208Y/120 building, outlets and lights run at 120 volts and three-phase equipment at 208. The nameplate on each piece of equipment lists its voltage, phase, and full-load amps, and the circuit, breaker, and disconnect are sized from it.
When the building doesn't have it
Not every commercial space has three-phase service. If yours doesn't, three-phase has to come from the power company, and whether it's available depends on the lines serving your site. Our estimator confirms compliance with the code and power company requirements before pricing the work.
Keeping the phases in balance
Single-phase loads on a three-phase panel each draw from one or two of the phases. When they're spread unevenly, one phase carries more than the others, and its breakers and conductors run hotter. Adding equipment is a good time to check how the panel's loads are divided.
When three-phase equipment trips, stalls, or runs hot, the cause gets traced as a repair.
Bringing Equipment Online
Bringing a Machine Online
-
1
1. The equipment details
Make, model, and nameplate data for each piece, and where it will sit.
-
2
2. A look at the panel and the route
Our estimator checks the service, the panel's capacity and open spaces, and the path the circuit will take.
-
3
3. Installation and connection
The circuit is run, the breaker and disconnect go in, and the equipment is connected.
-
4
4. First start
Before the equipment goes to work, we check the voltage on each phase and, on motors, the direction of rotation.
What's included
Three-Phase Loads and What They Need
| Equipment | Electrical work involved |
|---|---|
| Air compressors | Dedicated circuit, disconnect, and motor connection |
| Rooftop HVAC units | Circuit and disconnect at the unit |
| Shop machinery: saws, lathes, mills | A circuit run to each machine's location |
| Welders | A receptacle or hardwired connection sized to the welder |
| Three-phase panels and subpanels | Sized by load calculation |
| Relocated equipment | Circuit extended or rerouted to the new spot |
We don't take on heavy industrial work: transformers, switchgear, high-voltage systems, or PLC and VFD controls.
Pricing
Budgeting for Equipment Power
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Factors in the price
03- The distance from the panel to the equipment.
- The number of machines and disconnects.
- Code and power-company requirements if the service itself has to change.
Warranty
04If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
Real customer stories
The Job We Point To
The job we're proudest of was installing equipment for a commercial customer.
Straight from Google, in our customers' own words.
Our new equipment is rated at 230 volts, and the building is 208 volts. Will it work?
Do you program machine controls or drives?
We're moving a machine across the shop. How much work is that?
Contact us
Plan Power for Your Equipment
Request the estimator visit through the form. We'll get back to you during business hours.


