Service Riser and Meter Base Replacement in Spring Hill, FL
Meter Moves, Base Replacements, and New Post Services|Licensed & Insured, EC13011268
When a project on a Spring Hill lot runs into the meter, the meter becomes part of the project. The base, the riser above or below it, and the wiring to the panel all belong to the home's electrical service, so moving or replacing any of them has to be scheduled with the power company.
Tell us what's being built near the meter.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

At a glance
Spring Hill Meter Posts and the Permit Behind a Meter Move
About 1,406 of Spring Hill's roughly 49,000 housing units are mobile homes, by census estimates. At one of those, the meter may stand on a post or pedestal near the home, with the meter base and a disconnect on it and a feeder running to the panel inside. A project at one of these homes can move a post, and the power company's supply has to reach the post's new spot.
Hernando County's residential electrical permit names moving a meter as a job of its own. So when another project pushes the meter somewhere else, the move is permitted electrical work in its own right, even where the project behind it is not. Outside a flood zone, the county exempts a non-structural fence replacement and replacement siding from permits, but none of its exemptions reaches work that modifies an electrical system.
Apart from any project, ground sinking beside an underground riser can strain the meter base, and that has its own fix.
How it runs
Where the Meter Work Falls in a Spring Hill Project
-
1
Call while the project is still a plan
Tell us what's being built and where, and include a meter photo with the other trade's own schedule, so the estimator can see when the meter work has to happen.
-
2
The meter goes on the other trade's layout
If the base is moving, its new spot is marked on the fence plan, the wall drawing, or the lot layout before the other crew starts. Marked there, the spot is on the drawings the other crew already works from.
-
3
A pause in their work at the meter
The other trade leaves the meter area alone until meter day, which we set with the power company after the county has issued the permit. Once the service feeding the base is shut off, the base, the riser, and the conductors are replaced or relocated.
-
4
Their finish date comes after the inspector's
The meter is reinstalled only once the county's inspector has passed the new work, so book the other trade's finish for after that inspection. That crew then closes up around equipment already in its final place.
What we cover
Projects That Move a Meter Base or Its Riser
A fence or gate planned across the meter side
A new fence that runs past the meter can leave it inside a locked yard, or put a gate post right where the riser drops into the ground. A locked yard keeps the power company from its meter, so the plan has two answers: shift the fence line or the gate so the meter stays reachable from outside, or move the meter base to a spot the fence leaves open. On an underground service, mark the conduit's path before any post hole is dug.
Siding, stucco, or paint on the meter wall
A wall that is being re-sided or re-coated has a meter base fastened to it, with a riser strapped above or below. The base can't come off the wall while it's energized, so the new cladding either finishes around the base where it stands or waits for a scheduled shut-off of the service feeding it. Where rust has started along the base's bottom edge, or scorch marks circle the meter, the base is due for replacement, and the siding schedule is the time to plan that shut-off.
A re-roof with an overhead mast through it
On a house fed from a pole, the riser can climb up through the roof itself, with a collar sealing the hole around the pipe and the power company's line attached near the top. When the old roofing comes off, that collar comes off with it, and the pipe sits exposed from the base up. A rusted, bent, or loose mast can be replaced while the deck is open, so the new roof seals around sound pipe.
A replacement home on a Spring Hill lot with a meter post
When an older mobile home leaves a lot and a newer one is set, the post has to suit where the new home sits. A longer home, or one set at a different angle, can leave the old post in the way of the setup or out of place beside the new home, and then the post moves with the new layout.
Pricing
Where a Riser or Meter Base Price Comes From
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Our warranty
04If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
The post holding our Spring Hill mobile home's meter is leaning. Who replaces it?
We're adding an EV charger and a pool heater. Does the meter base have to get bigger?
Can the old meter base be reused at its new spot?
We're re-roofing around the mast on our Spring Hill house. Does the code ask anything of the mast itself?
The power line to our house sags over the spot for a new shed. Who handles that?
Reviews
Kennedy Electric Jobs, Owner by Owner
Straight from Google, in our customers' own words.
Request service
Bring the Meter Into Your Spring Hill Project Early
Describe the project, where it meets the meter, and when the other work is scheduled. A photo of the meter helps. Our office will reach you during business hours.



