HomeService AreasSpring HillNew Construction Electrical
New Construction Electrical in Spring Hill, FL
New Homes on Spring Hill Lots|Builder or Owner-Builder Permits|Licensed & Insured, EC13011268
Houses are still going up on Spring Hill's platted lots. On a new one, the name on the Hernando County permit shapes the electrical schedule, right down to the day the county releases power.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

Owner-builder permits
Who Holds the Permit on a New Spring Hill House
Hernando County's application for a single-family owner-builder permit includes the electrical disclosure required by Florida law. It lets you, as the owner, act as your own electrical contractor and wire a single-family home without a license, as long as the house is for your own use and not built for sale or lease. The same packet is plain about the other case: if a contractor is doing the work, the contractor is required by law to pull the permit.
Owner-builders and the power release
If you're the owner-builder and hiring the trades, the county's checklist asks for a notarized affidavit from the electrical subcontractor stating it's doing the work on that job, or the subcontractor signature page in the application, and contractors you hire are added to the permit. The line that changes your move-in date is further down: as an owner-builder, electrical power will not be released until all finals are complete, and you aren't eligible for automatic early electric release. Getting power earlier takes a separate form to the Building Division and a justifiable cause.
On a house you're building yourself, then, the electrical final is one of several that must pass before the meter can go live. Plumbing, mechanical, and the building final have to catch up to it.
How a Spring Hill build runs
Five Points Where the Electrical Meets the County
-
1
1. Decide whose name is on the permit
A general contractor's permit, or your own as owner-builder. That choice sets who schedules the inspections and how the power release works.
-
2
2. Plans with the electrical sheet
The county asks for an electrical drawing in the plan set. We can run the load calculation it's drawn from.
-
3
3. Our paperwork on your permit
For an owner-builder job, the electrical subcontractor's affidavit or signature is included with the application.
-
4
4. Rough-in, then the walls
Inspected while the framing is still open.
-
5
5. Finals on the county's clock
Hernando's ordinance requires that finals be scheduled within 10 days of finishing the work. On an owner-builder permit, the power release waits for every one of them.

Estimates
Estimating the Electrical on a New House
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen the plans.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Our warranty
03If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
What happens if the electrical inspection is red-tagged?
I'm an owner-builder. Can I wire part of the house myself and hire you for the rest?
Can we sell the house soon after it's finished?
Reviews
What Customers Have Written About Us
Straight from Google, in our customers' own words.
Contact us
Start Your Spring Hill Build With Us
Tell us whose name is on the building permit and where the build stands. We'll get back to you during business hours.



