Hurricane Electrical Prep in Spring Hill, FL
Planned for the Whole Outage, From the Off-Season to Power Back|Licensed & Insured, EC13011268
The hours after a hurricane knocks out the power are a poor time to work out how a generator should connect to a Spring Hill house. That question is best settled in the quiet months. Our electricians install portable generator hookups and whole-house surge devices, and help you pick the circuits your household needs.
Have your generator's make and model handy.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

At a glance
Where the County Map Puts a Spring Hill House
Hernando County ties its evacuation levels, A through E, to potential storm surge heights, from up to 13 feet at Level A to up to 34 feet at Level E, and each higher level adds more of the map. Areas shown in white on the county's map are non-evacuation zones. Depending on where an address falls, a Spring Hill household may be told to leave, or it may ride out the outage at home, and prep for staying looks very different from prep for leaving. Look up your address's level on the county map before planning anything electrical.
Mobile-home and RV residents are a separate case: the county directs them to evacuate for any hurricane order, wherever they live. Spring Hill has about 1,406 mobile homes, a census estimate. For those households, the electrical prep centers on the return, when an electrician checks the meter post or pedestal and the home's feeder before the home is switched back on.
The county's guide is blunt about generators: "NEVER connect a portable generator to building wiring." That warning is about back-feed, power pushed out of the house and onto lines that crews and neighbors assume are dead. A generator inlet with an interlock or transfer switch behind it goes in under a county permit and inspection, and it lets only one source, the generator or the grid, feed those circuits at a time. Where none is installed, appliances plug straight into the generator, as the county directs.
How it runs
Hurricane Prep Steps for a Quiet Forecast
-
1
Choose the circuits as a household
Sit down with everyone who will be home and list what has to run: the refrigerator, a fan in each bedroom, a few lights, and outlets for phones. About 19 in 20 occupied Spring Hill homes heat with electricity, a census estimate, so the heat pump or electric furnace and the air conditioner are among the house's biggest electric loads, and those usually stay off a portable generator's list. Plan comfort around fans and one cool room.
-
2
A county permit, then the inspection
A hookup adds new wiring at the panel, which puts it under a Hernando County permit, and our office handles the application. Each inspection the permit calls for is one more step before the hookup is ready, and one more reason to start in the quiet months.
-
3
Write the switch-over down at the panel
Once the electrician has shown you the switch-over, write the order on a card and tape it inside the panel door with your circuit list, so anyone in the house can follow it.
What we cover
Hurricane Prep Across One Outage, From Start to Finish
In the calm months
This is the only stretch with time for installed work. A generator hookup puts a weatherproof inlet on an outside wall, plus a panel interlock plate or a separate manual transfer switch, and a generator breaker matched to that inlet. If you also want a whole-house surge device, it goes into the panel as well. A panel showing heat, scorching, or corrosion has to be settled before anything new is added to it.
When a hurricane is in the forecast
From here on, the list belongs to the household: find the generator cord and look it over for cuts or crushed spots, pick the level, open patch of ground outside for the generator, and store its fuel as its manual directs. Keep a flashlight at the panel, and make sure the breakers you plan to run are labeled clearly enough to read by its light.
While the power is out
Run the generator outside, clear of any door, window, or vent, as the county advises and as its manual sets out. With an interlock, and as long as the storm left the panel undamaged and dry, the main breaker goes off before the generator breaker goes on, and the circuits you don't need stay off so the generator isn't overloaded. Call 911 at the first sign of smoke, sparks, or a burning smell.
Once the grid is back
Shut the generator down and reverse the switch-over before the utility side carries the house again. Anything water or the storm reached, indoors or out, stays off until an electrician has gone over it. On the outside wall, a riser or meter base pulled loose is ours to repair on the house side, while the meter and its seal are not for owners to touch. Farther out, a downed line belongs to the power company, so keep well away from it and let them know where it is.
Pricing
Estimates and Billing for Hurricane Prep Work
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Our warranty
04If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
Our Spring Hill garage holds a chest freezer. Does it need the generator the whole time?
Our Spring Hill panel is mounted outdoors. Is the switch-over any different?
A surge device is in our Spring Hill panel now. Should the electronics still be unplugged?
Our generator is running low on fuel partway through an outage. Can we top it up while it runs?
Does an interlock change how the panel works on an ordinary day?
Reviews
Written by Households Our Electricians Have Visited
Straight from Google, in our customers' own words.
Request service
Get Your Spring Hill House Ready Before the Next Watch
Tell us your generator's make and model, the brand on your panel's label, and which rooms matter most when the power is out. Our office will reach you during business hours.



