HomeService AreasSugarmill WoodsPanel Upgrade and Replacement
Electrical Panel Upgrades in Sugarmill Woods, FL
Replacements and Larger Services|Duke Energy or WREC by Address|Licensed & Insured, EC13011268
Oak Village's deed restrictions name both of the community's power suppliers, Progress Energy (now Duke Energy) and Withlacoochee River Electric Cooperative (WREC), and require an underground hookup for homes completed after the rule took effect in 2005.
Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

Two utilities
Duke Energy and WREC in Sugarmill Woods
Sugarmill Woods is served by either Duke Energy or WREC, depending on the address, and your electric bill shows which one. On a Duke service, the conductors on the line side of the meter are typically the company's.
WREC's chart of who owns what, drawn for both overhead and underground service, places the service line and the pad-mounted transformer on the cooperative's side, and the meter socket and meter panel on the member's side. WREC's steps for a service upgrade come from the cooperative.
From the Ground up
What Stays in the Ground and What Changes
A same-size replacement and a larger service both go under a Citrus County electrical permit, which we pull.
| Part of the service | Same-size replacement | Larger service |
|---|---|---|
| Buried line to the meter | Left as it is | The utility decides whether it's replaced for the new size |
| Conduit up the wall | Left as it is | Can need replacing to fit larger conductors |
| Meter base and outside wall | Left as it is, unless the county adds an outdoor disconnect when it issues the permit | A larger meter base, plus the same disconnect question |
Estimates
What a Sugarmill Woods Panel Estimate Settles
We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.
We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.
Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.
Workmanship and parts coverage
03If something we installed fails because of our workmanship within 30 days of completion, we waive the hourly labor to put it right. Materials Kennedy Electric purchases for your job carry the manufacturer's one-year warranty. To replace defective materials we supplied, or materials damaged by storm, flood, fire, or other acts of God, we charge a reduced warranty labor rate of $50 an hour residential and $75 an hour commercial. The warranty does not cover materials not purchased by Kennedy Electric, work performed by the customer, or materials the customer purchased or damaged. Our warranty terms are printed on the estimate, the invoice, and the receipt, and the product boxes stay with you so you can register each product with its manufacturer.
Reviews
Customer Reviews, Live From Google
Straight from Google, in our customers' own words.
Will the ground by the meter be dug up?
What does the utility need to know about a larger service?
Contact us
Plan a Sugarmill Woods Panel Job With Us
Tell us the address, your village, the utility on your bill, and the amperage on the panel label if you can read it. Our office will call you back during business hours.



