HomeService AreasCitrus Springs

Electrician in Citrus Springs, FL

Repairs, Upgrades, and Additions for Detached Homes|Licensed & Insured, EC13011268

Citrus Springs was laid out as more than 34,000 homesites, and the 2020 census counted 4,445 housing units in Citrus Springs.

Call (352) 251-2795, Monday through Friday, 8 a.m. to 4 p.m., or send a request online. Calls after hours are returned the next business day.

Include the street address and the year the house was built, if you know it.

Licensed & Insured · Florida Certified Electrical Contractor EC13011268★ Google RatedResidential and commercial electrical work

A Plat Still Filling In

A Plat Still Filling In

The Deltona Corporation developed the subdivision. Population rose from 8,622 in 2010 to 10,246 in 2020. The American Community Survey reports that 96.2% of housing units are one-unit detached homes, with a median build year of 1998.

01

Building on your own lot

If you're building a custom home on a Citrus Springs lot, we work through your general contractor. That can include the design concept for lighting and outlet placement and the load calculation that sizes the panel.

02

Power on a lot before the house is finished

Citrus County covers temporary power with a single application for three setups: a temporary pole, a temporary underground service (TUG), and pre-power for a house that's still being built. The contractor and the property owner both sign it. A TUG approval is for the service and GFCI outlets only, and the county wants the permanent service already on the structure, grounded, fitted with a surge arrester, protected from weather, and marked with an energized-parts warning. Pre-power asks more of the house: it has to be weather-tight, and every energized panel needs its breakers installed and labeled, its wiring pulled, and an electrical inspection completed.

Temporary construction power is work we do, and on a custom home we set it up through your general contractor.

Address and permits

A Dunnellon Address With a Citrus County Permit

Citrus Springs addresses use ZIP 34433 or 34434, and many carry a Dunnellon mailing name. Dunnellon itself is in Marion County. Citrus Springs is unincorporated in Citrus County, so electrical permits are issued by the Citrus County Building Division, regardless of the mailing address. We pull the permit there when a job needs one.

Kennedy Electric electrician at the service van

Scheduling

How We Schedule Citrus Springs Jobs

Panel upgrades and EV chargers start with a visit from our estimator, who reviews the panel and the spot you have in mind and confirms what the code and the power company require. Repairs are booked as a service visit with one of our electricians.

We don't do upfront pricing. No job has a standard price with us: each one is tailored to the property and the work you've asked for, and priced once we've seen it.

We offer free estimates on installs, upgrades, and replacements in our service area. Estimates aren't free when the job needs troubleshooting or testing to price, falls after hours or outside our service area, needs several meetings to gather information, or is new construction or a custom remodel with multi-party walk-throughs. For most jobs, estimates arrive by email by the end of the next business day, and quotes are good for 30 days.

Custom homes and large or multi-phase projects are estimated as soon as we can, or on the timeline your project sets.

Repair and troubleshooting visits are billed by the hour from arrival: $100 residential, $150 commercial, one-hour minimum, then half-hour increments, plus materials. No trip charge and no service fee. No hidden fees: the 3.5% surcharge on card and ACH payments is listed in our terms.

Frequently asked Questions

Questions About Citrus Springs Lots and Addresses

My mailing address says Dunnellon. Who issues the permit?

Citrus County. Dunnellon is in Marion County, but a Citrus Springs home is in unincorporated Citrus County, so the Citrus County Building Division issues the permit for whatever town the mailing address names.

How long can temporary power stay on while our Citrus Springs house is finished?

Citrus County approves TUG and pre-power for up to 180 days. Nobody can move in until the county issues the certificate of occupancy, and if the house is occupied before then, the county's form authorizes the building official to have the utility cut off the power without notice.

Open Lots and New Houses

Citrus Springs Services for Open Lots and New Houses

01

Outdoor lighting beside an empty lot

About 29,000 Citrus Springs lots were still available in early 2025, so a house here can have an undeveloped lot on one or both sides. With no neighbor's porch light across the property line, the driveway, entry, and side yards get their light from fixtures on your own house.

02

A custom home on an infill lot

Citrus County issued 1,529 single-family home permits and 784 certificates of occupancy in Citrus Springs in the two years reported in January 2025, with builders buying lots one at a time.

Reviews

Reviews Posted on Google

Straight from Google, in our customers' own words.

Google reviews widget · live from GBP

Contact us

Request Work in Citrus Springs

Give us the street address (a Dunnellon mailing name is fine), whether the house is new or under construction, and what you'd like done. We'll get back to you during business hours.

Kennedy Electric
1160 Ponce De Leon Blvd, Brooksville, FL 34601
Monday through Friday, 8 a.m. to 4 p.m.
Licensed & Insured · Florida Certified Electrical Contractor EC13011268
Serving Citrus, Hernando, and Pasco Counties, and nearby Sumter County.
Property type*
Best way to reach you*